摘要
从部分因合同管理问题失败的PPP项目实例入手,分析了合同形成阶段需要对项目论证并对社会资本进行筛选,并保证合同的公平性和合法性,综合考虑全方面因素,在合同履约阶段需要在法律允许的范围内确保政府和社会资本的责任划分及履行,最后分析了PPP项目合同管理中的部分技术性问题,为PPP项目的合同管理提供了一些参考。
From the part of the contract management problems of failure of the PPP project instance,this paper analyzes the stage of formation of the contract,needed to project and filtered to social capital,and to ensure fairness and legitimacy of the contract,considering all factors,the contract stage performance is within the scope of the law allows to ensure that the responsibility of the government and social capital division and the performance of the final analyses some technical problems in the PPP project contract management,providing some references for the PPP project contract management.
出处
《科技风》
2019年第12期248-248,共1页
关键词
PPP模式
合同管理
重难点
PPP model
Contract management
Difficult point