摘要
在大体积混凝土承台基础的的施工中,结合施工现场的特定条件,由于采取一系列有效施工措施,保证了基础土方顺利开挖及钢筋混凝土结构的施工质量。
During mass concrete construction of foundation platform, process should be taken according to specific conditions site, the project have adopted with a series of construction measures so that the deep foundation work have been carried out perfectly and their qualities of R.C. structure could have been fully guaranteed.
出处
《科技信息》
2006年第7期69-70,共2页
Science & Technology Information