摘要 为在工程实践中能推广应用"建设项目全过程造价确定的方法",结合这种方法的一般步骤,将BIM相关技术应用到这些具体步骤中,探索出了BIM应用在"项目工作分解结构的获得"、"项目活动清单的获得"这些步骤的具体实现途径,提出了"基于BIM的建设项目全过程造价确定方法",为建设项目全过程造价确定方法在工程实践中的应用奠定了一定的基础。 For promotion and application in engineering practice 'the method of cost confirmation of construction whole process ', combined with the general steps of this method, the BIM related technology is applied to the specific steps, explore the BIM application in 'the acquire of the project work breakdown structure','to obtain Project activities listing'and other concrete implementation way of these steps, founded the 'method to presented the cost confirmation of construction project whole process of based on BIM ', For the whole process of construction project cost determination method in the application may provide the basis of engineering practice.
作者 黄华
出处 《科技信息》 2014年第5期215-216,共2页 Science & Technology Information
关键词 全过程造价确定 BIM(建筑信息模型) 确定方法 Cost confirmation of whole process BIM Methoh for determining
  • 相关文献

参考文献1

二级参考文献8

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 3Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 4Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 5Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 6Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 7Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 8Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.

共引文献623

同被引文献28

  • 1王丽霞.输变电工程项目造价管理研究[D].华北电力大学(北京),2011.
  • 2王珺.BIM理念及BIM软件在建设项目中的应用研究[D].成都:西南交通大学,2011.
  • 3王琚.BIM理念及BIM软件在建设项目中的应用研究[D].西南交通大学,2011.
  • 4沈华麟.基于BIM技术的变电站建模及工程量统计[D].北京:华北电力大学,2014.
  • 5David Bryde,MartíBroquetas,Jürgen Marc Volm.The project benefits of Building Information Modelling(BIM)[J].International Journal of Project Management,2013,31(7):971-980.
  • 6Atul Porwal,Kasun N.Hewage.Building Information Modeling(BIM)partnering framework for public construction projects[J].Automation in Construction,2013(31):204-214.
  • 7Li Juan Chen,Hanbin Luo.A BIM-based construction quality management model and its applications[J].Automation in Construction,2014(46):64-73.
  • 8Reijo Miettinen,Sami Paavola.Beyond the BIM utopia:Approaches to the development and implementation of building information modeling[J].Automation in Construction,2014(43):84-91.
  • 9Rebekka Volk,Julian Stengel,Frank Schultmann.Building Information Modeling(BIM)for existing buildings-Literature review and future needs[J].Automation in Construction,2014(38):109-127.
  • 10王英,李阳,王延魁.基于BIM的全寿命周期造价管理信息系统架构研究[J].安徽建筑,2014(4):257-259.

引证文献7

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部