5Ainsworth R A,Bannister A C,Zerbst U.An overview of the European flaw assessment procedure SINTAP and its validation[J].International Journal of Pressure Vessels and Piping, 2000,(77): 869-876.
6Beighle B D,Gloven P. Relative Risk assessment-The competitive advantage[A].Proceedings of the Interntional Pipeline Conference[C].ASME: 1998.
7Grimes Kiife after inspection[A].Proceedings of the International Pipeline Conference[C].ASME: 1998.
8IIW.Guidance on assessment of the fitness for purpose of welded structures[R].Draft for development, IIW/IIS-SST-1157-90.
9Budden P J,Sharples J K, Dowling A R.The R6 procedure:recent developments and comparison with alterative approaches[J].International Journal of Pressure Vessels and Piping, 2000,(77): 895-903.
10Anderson T L,Osage D A.A comprehensive fitness-for-service guide[J].International Journal of Pressure Vessels and Piping,2000, (77):953-963 .