摘要
文章结合现场实际情况 ,介绍了转角塔角钢插入式基础在考虑铁塔预倾斜情况下基础预偏的计算及控制方法 ,为工程新工艺施工提供了重要理论依据 ,保证了工程质量 。
According to the actual situation on-the-spot,the paper introduces pre-tiltings calculating and controlling method while considering iron tower pre-tilting to corner tower angle steel inserted type base.These offer theory basis for new technicss construction,assure project quality,and accumulate some experiences for the same type project.\ Corner tower Angle steel Inserted tgpe base Pre-tilting Calculating
出处
《青海电力》
2003年第1期21-23,共3页
Qinghai Electric Power