摘要
MAXIMO是从国外引进的大型设备维修管理系统,具有较先进的管理模式和规范的工单流程。珠海发电厂结合原型系统的生成条件,联系本厂实际,形成了适合自己的工单管理模式,并对设备维修管理系统作了多项重大改进,提高了设备检修速度,为设备安全运行打下了良好的基础。
MAXIMO is an imported equipment maintenance managing system with advanced management mode and normalized work sheet flow. Based on the features of the original system and the practical situations, Zhuhai Power Station made multiple major improvements on the system to speed up equipment maintenance and lay a firm foundation for the safe running of equipments.
出处
《广东电力》
2003年第1期48-50,共3页
Guangdong Electric Power