澳大利亚SINO选矿厂运行调试问题分析 被引量:6

Analysis on commissioning problems of benefi ciation plants in Australia SINO Iron Mine
原文传递
导出
摘要 针对澳大利亚SINO铁矿选矿厂调试中出现的精矿产量、品位不达标,运转率低等问题,经分析认为,自磨回路循环负荷率偏高是影响工艺指标的关键因素;工程细节设计问题对运转率影响很大。通过减小顽石破碎粒度和旋流分级返砂量,平衡自磨-球磨处理负荷是工程整改的核心。最后对该项目的发展方向进行了预测,从项目策划和管理角度提出了海外选矿项目工程设计应注意的事项。 After analyzing such problems during commissioning of benefi ciation plant in Australian SINO Iron Mine as insuffi cient concentrate output, substandard grade, low operation rate etc, high rate of circulating load in AG circuit was regarded as the key factor affecting production indexes, and engineering design details had great impact on the operation rate. The key engineering modifi cation was to balance the load between AG mill and ball mill by decreasing the grain size of crushed pebble and cyclone returns. At last, the development direction of the SINO project was predicted, and the matters needed to pay attention during the engineering design of overseas beneficiation projects were offered from the point of view of project planning and management.
出处 《矿山机械》 北大核心 2014年第8期105-109,共5页 Mining & Processing Equipment
关键词 SINO 铁矿 运行调试 问题分析 设计改进 SINO Iron Mine operation and commissioning problem analysis design modifi cation
  • 相关文献

参考文献5

二级参考文献11

  • 1尚庆,张健,周力行.QUICK格式在湍流旋流流动数值模拟中的应用[J].计算物理,2004,21(4):283-289. 被引量:12
  • 2段其福 呼晓明.世界特大型磁铁矿山--中信泰富SINO铁矿.现代矿业,2009,(9):1-7.
  • 3Lucia Fernandez Martinea.Vortex finder optimum length in hy- drocyclone separation [J]. Chemical Engineering and Processing 47(2008): 192-199.
  • 4KUdaya Bhaskar. CFD simulation and experimental validation studies on hydrocyclone [J]. Minerals Engineering 20(2007): 60- 71.
  • 5张永红.水力旋流器部分结构参数对其性能影响的研究[D].陕西:西安建筑科技大学冶金工程学院,2006.
  • 6Alex G Doll Consulting Ltd. Technical memorandum[EB/OL].http://www.sagmilling.com/articles/TechMemorandum-Mine331-Rev2.pdf,2012.
  • 7Morrell S. Predicting the specific energy of autogenous and semiautogenous mills from small diameter drill core samples[J].Minerals Engineering,2004,(17):447-451.
  • 8Morrell S. The appropriateness of the transfer size in AG and SAG mill circuit design[A].Vancouver,Canada,.
  • 9Napier-Munn T J,Morrell S,Morrison R D. Mineral Comminution Circuits Their Operation and Optimisation[M].Brisbane:Julius Kruttschnitt Mineral Research Center,1999.154-191.
  • 10Kojovic T,Powell M S,Bailey C. Upgrading the JK SAG mill model[A].Vancouver,Canada,.

共引文献35

同被引文献22

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部