摘要
为了提高枫树坝水电厂2号水轮机出力,需要对水轮机进行增容改造。为此,对最大净水头进行了计算,并分析了最大净水头对改造设计的影响,以及设计应达到的标准。探讨了通过新的设计手段达到目标的途径。
A capacityincreasing transformation is needed to improve the output of No.2 water turbine in Fengshuba Hydropower Plant. This paper calculates the maximum net head, analyzes its influence on transformation design and describes the design standard. New design means are discussed as well.
出处
《广东电力》
2003年第1期68-70,共3页
Guangdong Electric Power