尾矿库溃坝溃口发展状态模拟试验 被引量:7

Simulation Test of the Development Status of the Breach of Tailings Dam Break
下载PDF
导出
摘要 我国尾矿库数量众多,早期建设的尾矿库标准偏低,存在较大的安全隐患。尾矿库一旦发生溃坝,将对其下游居民的生命财产安全造成巨大损失,并导致严重的环境污染。为此,需进行尾矿坝溃坝试验研究。在尾矿库溃坝试验中,由于每座尾矿库的具体情况不同,很难按照严格比例进行物理模拟,因此试验中主要采用概化模型,通过试验设计,对影响尾矿库溃坝的部分比变量进行研究,找出一般规律,为尾矿库溃坝治理提供参考。 There is a large number of tailings in China,the standard of the early period construction of tailings is low,the potential safety hazards is serious,if the tailings dam break is occurred,the life and property of the downstream residents will be threatened seriously and the significant environmental pollution could be caused. So,it is necessary to conduct the test of tailings dam break. During the test process of tailings dam break,due to the different specific circumstances of each tailings,so,it is difficult to conduct the physical simulation test based on the proportion strictly. Therefore,the generalized model is adopted in the test design in this paper,part of the proportion variables that affecting the tailings dam break are analyzed to discuss the general rules and some relative conclusions are drawn to provide some reference to deal with tailings dam break.
作者 秦柯 孟宪磊
出处 《现代矿业》 CAS 2016年第11期183-184,195,共3页 Modern Mining
关键词 尾矿库 溃坝 模型 溃口 陡坎 Tailings Dam break Model Break Scarp
  • 相关文献

参考文献4

二级参考文献73

共引文献144

同被引文献50

引证文献7

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部