摘要
介绍了实现Bently3300系列监测仪表与DCS间通讯的步骤;以尿素装置中大型机泵为例,对系统的硬件配置和连接、仪表内跨接片选择、通讯寄存器地址以及软件组态进行了描述。
The procedure of how to implement the communication between bently 3300 monitor and DCS is introduced. Based on an example of pumps in the urea plant hardware configuration and interconnection, jumperprogrammable selection, data register addressing and DCS software are described.
出处
《石油化工自动化》
CAS
2003年第2期73-77,共5页
Automation in Petro-chemical Industry