摘要
介绍芜湖长江大桥利用后锚固索代替压重法伸臂安装第 2孔连续钢桁梁时后锚固索的设计、布置及钢索的张拉、监测。
An introduction is given to erection of the second span of continuous steel trussed girder with rear anchorage cable replacing conventional counterweight method, detailing design, arrangement and stretching of cables, and monitoring and adjustment of cable force.
出处
《铁道建筑技术》
2003年第2期30-32,共3页
Railway Construction Technology