摘要 介绍了饱和—非饱和流—固耦合的有限差分方法的基本原理 ,并对泰安抽水蓄能电站进出水口围堰进行了三维饱和—非饱和流—固耦合数值模拟。分析结果具有良好的规律性 ,表明了该方法可用于大型土石坝的三维饱和—非饱和流—固耦合分析。同时 ,也分析了基础开挖过程对围堰和基础边坡稳定的影响 ,指出了在浅地表基础开挖对结构破坏影响不大 ,但对渗流的影响确是明显的。开挖只在局部产生一定的影响 ,因此在基础开挖侧必须预留一定宽度的平台 ,计算结果表明此项工程预留平台宽度不得小于 3m 。 In this paper,the principle of finite difference method in coupling saturated-unsaturated fluid with solid is given in detail,and the numerical simulation of 3D Coupbe of saturated-unsaturated fluid and solid for the cofferdam at inflow and outflon mouths of Taian Hydropower station.The method is confirmed to be effective and feasible and can be applied to analyze 3D couple of saturated-unsaturated fluid and solid for large soil-rock dam.At one time,the effect of the excavating process on the slope of cofferdam and foundation is analyzed.Numerical results give a conclusion that excavation of foundation at shallow ground has little influence on the failure of the foundation,but an obvious effect on seepage of the dam.Excavating process has a local effect, thus it must pre-reserve a platform with a width of 3m in order to make the slope table.
作者 郭衍敬
出处 《山东科技大学学报(自然科学版)》 CAS 2002年第4期99-103,共5页 Journal of Shandong University of Science and Technology(Natural Science)
关键词 抽水蓄能电站 进出水口 围堰 边坡稳定性 三维饱和—非饱和流—固耦合 数值模拟 基础开挖 渗流 saturated-unsaturated flow seepage FLAC couple of fluid and solid cofferdam
  • 相关文献

参考文献8

  • 1Yoshisuke Nakano.Theory and Numerical Analysis of Moving Boundary Problem in the Hydrodynamics of Porous Media.WRR,Feb.,1978,14(1).
  • 2Warrick A W.and Lomen D O.Two-dimensional Linearized Moisture Flow with Water Extraction[J].Hydrol.,1981,49:235~245.
  • 3Robet J.etc.Explicit Method for Two-dimensional Transient Free surface Flow[J].Hydra.Eng.,Aug.,1990,166(8).
  • 4Guymon,Gary L.Flow and Transport lawsin Unsaturated Zone Hydrology.Michael Hays,ed.,Printed by PTR Prentice Hall,USA,1994.
  • 5陈虹,陈彤.堤坝饱和-非饱和渗流数值模拟[J].水动力学研究与进展(A辑),1997,12(3):356-364. 被引量:5
  • 6FLAC-3D manual.Itasca Consulting Group,Inc.
  • 7Fluid-Mechanical Interaction,http:∥www.itascacg.com.
  • 8GB50286-98.堤防工程设计规范[S].[S].,..

二级参考文献2

  • 1毛昶熙,渗流计算分析与控制,1990年
  • 2团体著者,北江飞来峡水利枢纽高压喷射灌浆防渗试验报告,1989年

共引文献242

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部