摘要
通过对不对称箱型梁构件特点的分析、焊接规范参数选择、坡口制备、T8/ 5值工程计算、组装工艺以及校直工艺的制定 ,攻克了制作变形难关 。
The difficulty of manufacturing deformation was solved,which could meet the technical requirements through a characteristic analysis of dissymmetrical box beam members,selection of the parameters in welding codes,groove preparation,T 8/5 engineering calculation,formulation of assembling and aligning processes.
出处
《钢结构》
2003年第1期46-49,共4页
Steel Construction