摘要
介绍在滑坡体上地下裂隙水丰富、流砂、淤泥、块石土等复杂地质条件下 ,采用多种特殊施工方案 ,解决抗滑桩施工的难题 ,并利用施工现场的第一手资料进行造价分析。
This article gives an introduction to the adoption of multi-scheme for solving the difficult issue of anti-slide pile construction under such complicated geological conditions as rich ground crevice water on land-slide body with shifting sand, mud and stony soil. It also makes a cost analysis by using the first-hand material on the construction site.
出处
《铁路工程造价管理》
2003年第1期6-8,共3页
Railway Engineering Cost Management
关键词
复杂地质条件
抗滑桩
施工技术
造价分析
complicated geological conditions, anti-slide pile, construction technique, cost analysis