摘要
本文介绍了武汉军山长江公路大桥斜拉索道管施工技术,并提出了高难度、高要求三维空间体的难度分解及转移。
The paper presents an introduction to the technology employed to erect the staycable tubes for the cable stayed highway bridge across the Yangtze River in Junshan,Wuhan,and the resolution and transference of difficulty in a three dimensional spatial body of high difficulty and requirement.
出处
《中国港湾建设》
北大核心
2003年第1期36-38,共3页
China Harbour Engineering
关键词
武汉军山长江公路大桥
主塔
索道管
施工技术
劲性骨架
测量控制网
误差分析
斜拉索
Junshan Highway Bridge over Yangtze River in Wuhan
main tower
stay-cable tube
construction technology
stiff skeleton
survey control network
error analysis