摘要
文章介绍了汕头LPG码头工程3号泊位采用液压桩锤沉桩的施工经验及推广应用。
The paper presents an introduction to the experience in pile driving with hydraulic jumper hammers for the construction of No.3 Berth at Shantou LPG Terminal and explores the popularization of the technology.
出处
《中国港湾建设》
北大核心
2003年第1期42-45,共4页
China Harbour Engineering