摘要
昌马水库工程是甘肃省重点工程,在施工中对测量放线要求较高,力了提高放线精度及效率,在放线中引入可编释序的 casio fx- 4500P计算器配合,迅速处理放线数据,取得了可喜的效果。
The Changma reservoir is a major project in Gansu Province, with high requirements for setting out survey in construction. In order to increase the precision and efficiency of setting out, the programmable Casio fx - 4500p computer aided survey is adopted. The data of setting out is quickly processed and satisfactory results are obtained.
出处
《西北水电》
2003年第1期14-16,共3页
Northwest Hydropower