摘要
2#明流洞全长1105 m,其中下游洞长108 m,开挖断面为直墙圆顶的城门洞型,尺寸为宽12.4 m,高15.4 m,在桩号为0+472~0+515处有F240断层通过,稳定性极差。断层开挖采用短进尺、弱爆破、强支护、勤监测等施 工措施,成功地完成了施工任务。
Free flow tunnel No. 2 is 1105 m long and its downstream section is 108 m. The excavation section is in a reversed U shape 12. 4 m wide by 15. 4 m high. At station No. 0+481, 7 m3 debris collapsed during excavation. Therefore, the principle of short drilling footage, small blasting, strong support and frequent monitoring is adopted for the fault excavation.
出处
《西北水电》
2003年第1期26-27,共2页
Northwest Hydropower
关键词
小浪底水利枢纽工程
明流洞
断层
开挖
钻爆设计
支护
free flow tunnel No. 2
fault
excavation
drilling and blasting design modification
support