摘要
通过对目前后浇带做法的分析 ,介绍了后浇带的设计、施工要求。针对后浇带设计施工规定不一致 ,提出了后浇带正确的接缝形式、位置、采用的混凝土及浇灌时间 ,从而保证工程质量。
Through analysis on present construction of the later poured band the design and construction requirements are introduced. According to the disparities existed in design and construction the type of joint seam, position, accepted concrete and pouring time in the later poured band's construction is introduced to ensure the engineering quality.
出处
《山西建筑》
2003年第4期64-65,共2页
Shanxi Architecture