摘要
对混凝土冬期施工方法进行了分析 ,从试验室配合比、现场确定、试件留置、不合格处理等方面进行了论述 ,提出通过现场掌握坍落度 ,专人值守 ,加外加剂等方法 。
The winter construction method of concrete is analyzed. From mix proportion experiment, field operation, retained sample and other aspects its quality control is discussed. Author points out that through some serious control such as controlling slump and adding additive the concrete quality can be effectively pre controlled.
出处
《山西建筑》
2003年第4期199-200,共2页
Shanxi Architecture