摘要
从立项、技术设计、施工、招投标及承包合同签定、施工、竣工结算等方面 ,阐述了基建工程在不同阶段的投资控制目标 ,并分析了投资控制与质量、进度控制的关系 ,最终达到主动控制、动态管理的目的。
In this paper the investment control objectives in different stages in capital construction project are elaborate from project setting, technical design, construction, contract judgement and final account. At the same time the relationships among investment control, quality and schedule control are analyzed to realize dynamic control and management for capital construction project.
出处
《山西建筑》
2003年第4期213-214,共2页
Shanxi Architecture
关键词
基建工程项目
投资控制
招投标
索赔
立项阶段
capital construction project, investment control, bid, claim, project setting stage