三峡升船机监理安全管理措施与成效 被引量:1

Safety management measures and results of Three Gorges ship lift supervision
下载PDF
导出
摘要 三峡升船机主体工程施工历时7 a,施工期间长期面临立体交叉作业、高空作业及临空面多,土建施工大量运用非标起重机械,金属结构及设备安装工程量大等复杂因素。为了做好施工期安全管理,升船机建设各方领导高度重视,制定完善了安全管理制度,建立了交叉作业协调机制,加强安全检查与考核,施工过程中高危作业风险得到有效控制,施工期安全管理成效显著。 The construction of the main project of the Three Gorges ship lift lasted for seven years.During the construction period,it faced with three-dimensional operations,high-altitude operations and multiple free faces.In addition,large quantities of non-standard cranes were used in civil engineering construction and large quantities of metal structures and equipment were installed.In order to ensure the safety management during the construction period,the leaders of all parties involved in the construction of lift ship attach great importance to the development and improvement of the safety management system and set up a cross-operation coordination mechanism to strengthen the safety inspection and assessment so that the risk of high-risk operation was obtained effective control in the construction process.Safety management achieved remarkable results during construction.
出处 《中国安全生产科学技术》 CAS CSCD 北大核心 2017年第S2期107-110,共4页 Journal of Safety Science and Technology
关键词 三峡升船机 安全管理 措施 成效 three gorges ship lift safety management measures results
  • 相关文献

参考文献3

二级参考文献2

  • 1梁仁强.制定升船机相关质量检测及评定标准[c]//国务院三峡工程建设委员会,中国长江三峡工程开发总公司.中国三峡建设年鉴.北京:中国三峡出版社,2011:162-168.
  • 2郭彬,金海军,曹怀志.三峡升船机关键技术问题[J].水力发电,2009,35(12):79-81. 被引量:17

共引文献23

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部