φ40m×107m PS炼铜转炉的加长改造 被引量:2

RECONSTRUCTION OF φ4.0m×10.7m PS COPPER CONVERTER FOR CAPACITY EXPANSION
下载PDF
导出
摘要 原设计年产10万t电解铜的金隆公司,通过生产挖潜和局部设备改造,电解铜产量提高到15万t,电铜加工成本每吨降低400元。此项改造后,其炼铜PS转炉的冰铜装入量由每炉160t增加到230t,满足了公司扩产后对转炉的能力要求。本文介绍了转炉改造的加长方法、内容及特点,重点阐述了改造中转炉驱动系统方案的设计选择及采用伞齿 圆柱齿减速机的实际使用效果,为相关转炉扩容改造提供了实践经验。 Through exploiting the production potentialities and remodeling the partial equipment in Jinlong Copper Mine,the output of electrorefined copper was increased annually from 100 to 150kt and the production cost of electrorefined copper was decreased by 400RMB/tAfter the remodeling,the copper matte capacity of PS copper converter was increased from 160 to 230t,thus meeting the requirement for converter capacityIn this paper,the technique,items and features of the converter remodeling were introduced,and the selection of the converter's driving unit and the running effect of bevelcylindrical gear were expounded in particularIt provides useful experience for remodeling of such converters
出处 《矿冶》 CAS 2003年第1期71-74,共4页 Mining And Metallurgy
关键词 PS转炉 加长改造 驱动系统 伞齿-圆柱齿减速机 PS converter Remodeling for capacity expansion Driving system Bevel-cylindrical gear
  • 相关文献

参考文献4

  • 1黄辉荣.金隆闪速熔炼系统技术改进及其效果[J].矿冶,2001,10(3):52-55. 被引量:3
  • 2机械设计手册联合编写组.机械设计手册(第二版:上册)[M].北京:化学工业出版社,1979..
  • 3南昌有色冶金设计研究院.金隆铜业有限公司挖潜改造工程初步设计[R].,2000..
  • 4方建中.金隆转炉开式齿轮强度计算书[R].,2000..

二级参考文献4

共引文献2

同被引文献13

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部