摘要 混凝土矮塔斜拉桥主梁多选用单箱多室截面,其箱室的布置受索塔位置的影响,长山大桥采用双塔双索面,其主梁的形式不同于常规的单箱多室截面,采用扁平流线型截面。本文计算分析了长山大桥主梁在成桥阶段下的受力状态,对此类截面主梁的受力特点进行了初步探讨。 The single box multi chamber section is often used in the girder of extradoses cable-stayed bridge. The box room layout is affected by the position of the tower. The Twin Towers and double-cable plane is used in the Changshan Bridge. The main form is the streamlined section that is different from conventional single box multi section. This article calculated and analyzed the stress state of main girder bridge under the stage of the Changshan Bridge, and discussed this kind of girder stress characteristics.
作者 沈光玉
出处 《辽宁省交通高等专科学校学报》 2014年第2期9-12,共4页 Journal of Liaoning Provincial College of Communications
关键词 矮塔斜拉桥 混凝土主渠 单箱多室截面 计算 extradoses cable-stayed bridge,concrete girder,single box multi section,calculation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部