摘要 为了满足大跨径斜拉桥目标成桥状态,得到大跨径斜拉桥在施工过程中拉索的张拉力,提出了大跨径斜拉桥在施工过程中的拉索索力计算调整拉索无应力长度的降温法。倒退分析法和传统无应力状态控制法在计算大跨径斜拉桥施工过程中存在缺陷,在传统无应力状态控制法的基础上,提出了调整拉索无应力长度的降温法。该方法可用于计算大跨径斜拉桥且计算方法简单,计算结果精度较高,能够满足工程要求。 In order to achieve the objective state of the large span cable-stayed bridge and get its cable tension in the construction,this paper presents a new calculation method for the cable tension,that is,the cooling method of adjusting the cable length in stress-free state.It is put forward on the base of the traditional Stress-free Control Method owing to the construction faults of Backward Analysis Method and the traditional Stress-free Control Method.For its simple and accurate calculation,the new method can be applied to the calculation of large span cable-stayed bridges to meet the engineering demands.
出处 《洛阳理工学院学报(自然科学版)》 2015年第1期20-25,共6页 Journal of Luoyang Institute of Science and Technology:Natural Science Edition
关键词 大跨径斜拉桥 施工过程 无应力状态控制法 降温法 large span cable-stayed bridge construction stress-free control method cooling method
  • 相关文献

参考文献3

二级参考文献14

  • 1沈锐利.悬索桥主缆系统设计及架设计算方法研究[J].土木工程学报,1996,29(2):3-9. 被引量:175
  • 2吴运宏,黄晓航.重庆李渡长江大桥斜拉桥施工监控计算[J].桥梁建设,2006,36(A02):180-182. 被引量:15
  • 3中铁大桥勘测设计院有限公司.分阶段施工桥梁的无应力状态控制法与工程实践[R].湖北,2007.
  • 4黄晓航.武汉白沙洲大桥斜拉桥施工监控[A].中国公路学会桥梁和结构工程学会桥梁学术讨论会论文集[C].2000.409.
  • 5奥登 J T,里帕格 E A.弹性结构力学[M].北京:中国建筑工业出版社,1986.
  • 6中铁大桥勘测设计院有限公司.分阶段施工桥梁的无应力状态控制法与工程实践[Z].2007.
  • 7秦顺全.桥梁施工控制--无应力状态法理论与实践[M].北京:人民交通出版社,2006.
  • 8秦顺全,林国雄.斜拉桥安装计算--倒拆法与无应力状态控制法评述[A].1992年全国桥梁结构学术大会论文集[C].上海:同济大学出版社,1992.569-573.
  • 9秦顺全.桥梁施工控制-无应力状态法理论与实践[M].北京:人民交通出版社,2006.
  • 10秦顺全.分阶段施工桥梁的无应力状态控制法[J].桥梁建设,2008,38(1):8-14. 被引量:115