以镇江某项目的顶升纠倾为例,介绍了顶升纠倾的基本原理。并结合该工程现场施工资料及后期的裂缝、沉降观测报告,表明采用先基础加固后双向调整顶升纠倾不仅能够满足建筑物的使用性、安全性,而且具有良好的社会效益与经济效益。
Taking the jacking rectification of a project in Zhenjiang as an example,this paper introduces the basic principle of jacking rectification.Combined with the construction data of the project site and the observation reports of cracks and settlement in the later period,it is shown that the adoption of foundation reinforcement before bidirectional adjustment of jacking rectification not only can satisfiy the usability and safety of the building,but also has better social and economic benefits.
作者
李孟琳
Li Menglin(Jiangsu East China Geological Group Co.,Ltd.,Jiangsu,Nanjing 210007)
出处
《林业科技情报》
2019年第1期84-87,共4页
Forestry Science and Technology Information
关键词
双向
顶升纠倾
加固
锚杆静压桩
Bidirectional
jacking rectification
reinforce
pressed pile by anchor rod