期刊文献+

A Maintainability Prediction Method Considering Environmental Impacts and Cost

A Maintainability Prediction Method Considering Environmental Impacts and Cost
下载PDF
导出
摘要 Maintainability prediction is one kind of primary maintainability action. Design deficiency would be found through predicting maintainability parameters under certain conditions. Now a maintainability prediction method that mainly considers maintenance time or maintenance man hour is a kind of prediction method with a single index. With increasing product complexity and people's environmental consciousness, more attention is paid to environment impacts and maintenance cost or resource consumption in the maintenance process. It is necessary for a maintainability prediction method that can predict maintenance cost and maintenance environmental impacts. A new maintainability prediction method is presented in this paper based on analyzing existing maintainability prediction methods. The method is MABTCE(maintenance activity based timing/costing/environment impact assessment) and can predict maintenance time, maintenance costing and maintenance environmental impacts and then improve maintainability design with prediction results. Maintainability prediction is one kind of primary maintainability action. Design deficiency would be found through predicting maintainability parameters under certain conditions. Now a maintainability prediction method that mainly considers maintenance time or maintenance man hour is a kind of prediction method with a single index. With increasing product complexity and people's environmental consciousness, more attention is paid to environment impacts and maintenance cost or resource consumption in the maintenance process. It is necessary for a maintainability prediction method that can predict maintenance cost and maintenance environmental impacts. A new maintainability prediction method is presented in this paper based on analyzing existing maintainability prediction methods. The method is MABTCE(maintenance activity based timing/costing/environment impact assessment) and can predict maintenance time, maintenance costing and maintenance environmental impacts and then improve maintainability design with prediction results.
出处 《International Journal of Plant Engineering and Management》 2002年第4期179-184,共6页 国际设备工程与管理(英文版)
关键词 maintainability prediction LCA(life cycle assessment) ABC(activity based costing) MABTCE maintainability prediction, LCA(life cycle assessment), ABC(activity based costing),MABTCE
  • 相关文献

参考文献7

  • 1.maintainabilitydistributionandprediction[].GJB/Z.1994
  • 2.Environmentalmanagement———Lifecycleassessment:GoalandScopedefi nitionandinventoryanalysis[].ISO.1998
  • 3.Maintainabilityhandbook[]..1999
  • 4M. Z. Gan.maintainability design and testing[]..1995
  • 5Douglas T.Hicks, Activity-Based Costing[]..1999
  • 6Paolo Frankl.Life cycle assessment in industry and business[]..1999
  • 7Athelstan K. Y.Choi , A screening method for life-cycle inventory analysis for industrial material[]..1994

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部