摘要
通过对反应装甲特性分析,提出了聚能装药串联战斗部两级起爆延时间隔时间的选择方案,给出了延时间隔时间的计算公式和算例,并对两种方案进行了讨论。
Two ways for determining the delay time between initiations of the two stages of tandem shaped charge warhead (TSCW) was proposed through analyzing the characteristics of explosive reactive armor (ERA). The formulas and examples for calculating the delay time were also introduced in this paper.
出处
《火炸药学报》
CAS
CSCD
2003年第1期1-4,共4页
Chinese Journal of Explosives & Propellants