摘要
采用水枪冲土的施工方法,冲挖石头河水库溢洪道上因不适合上坝需要废弃的106万m^3土方,施工过程及冲土施工方案中水枪试制、配套加压站、排泥渠及冲土作业等内容。
The technique of earthwork excavation by washout gun is used for cutting the spillway of Shitouhe Reservoir, by which the 106×104m3 of unsuitable soil are removed away by hydraulic gun. The preproduction of hydraulic gun, the accessory press station, silt drainage trench and the operation of flush are discussed in this paper.
出处
《西北水力发电》
2003年第1期40-42,共3页
Journal of Northwest Hydroelectric Power