摘要 小电厂普遍存在设备老化、能耗高、环境污染严重 ,可靠性差等诸多问题 ,按国家能源政策必须淘汰 ,为充分利用厂址资源 ,应发挥小电厂技术改造的价值。本文以深圳月亮湾电厂技术改造工程为范例 。 In small power plants,many problems like aged equipment,high energy consumption,serious environmental pollution,and poor reliability,etc.generally exist.Such small power plants must be obsolete according to the national energy policy.For purposes of sufficiently using resources in plant site and developing the value of technical retrofit for small power plant,this paper takes the technical retrofitting project in Shenzhen Yueliangwan Power Plant as the example to probe into the effective approach of general layout for settling the problems that existed in the technical retrofitting project.
作者 高青
出处 《电力勘测设计》 2003年第1期56-59,共4页 Electric Power Survey & Design
关键词 小电厂 技术改造工程 总图设计 扩建工程 建筑物 small power plant technical retrofitting design investigation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部