摘要
白龙港WSM/1.1标浦西倒虹井地处复杂环境中,采用沉井法施工。施工中通过采取科学有效的技术措施,将沉井排水下沉至标高-20.18m,并确保了周围重要建(构)筑物的安全。以此工程为例,主要阐述沉井施工过程中的难点、采取的措施和取得的成效,为今后同类工程的施工提供借鉴。
The Puxi inverted shaft of Contract WSM/1-1 of Shanghai Bailong Port Sewerage Treatment Project lies in a very complicated condition and is constructed by caisson method. The caisson is sunk to -20.18m and the surrounding buildings is protected by adopting scientific and effective technological measures. This paper introduces the difficulties of the caisson construction, the applied measures and the obtained achievements.
出处
《地下工程与隧道》
2003年第1期28-32,共5页
Underground Engineering and Tunnels