摘要
对黄河上游龙羊峡-青铜峡河段40年来已建7座梯级水电站的环境效益进行初步回顾,通过资料分析提出了已建梯级水电站对库区、库周和下游带来的正面和负面的环境效益。
A preliminary review was made of environmental benefits from cascade hydro stations built on the Yellow River over 40 years. Based on analysis of information and data it has been presented that the cascade stations have brought forth environmental benefits and negative impacts in reservoir areas, vicinities of reservoirs and the downstream areas .
出处
《中国三峡建设》
2003年第1期33-35,共3页
China Three Gorges Construction
关键词
黄河上游
水电站
环境效益
梯级水电站
供水
防凌
Yellow River
upstream
hydro station in operation
environmental benefit
review.