摘要
结合青岛地铁试验段工程的设计与施工,分析了硬岩地层暗挖车站的埋深、结构型式、施工方法等问题,并对青岛地铁下一步的设计提出了建议。
Combining with the design and construction of the trial section of Qingdao Metro,some problems are analyzed,such as the depth,structure type,construction method of bored station in hard rock stratum. The suggestions are proposed for the next stage design for Qingdao Metro.
出处
《岩石力学与工程学报》
EI
CAS
CSCD
北大核心
2003年第3期476-480,共5页
Chinese Journal of Rock Mechanics and Engineering
关键词
硬岩地层
地铁车站
结构设计
青岛市
岩石力学
rock mechanics,hard rock,bored excavation,big span,structure,design