摘要
文章结合武隆隧道横洞工区的工程概况和施工总体方案要求 ,从开挖、支护、运输、衬砌、通风等工序和环节论述了施工机械设备的选型和配套原则 ,介绍了各施工工序的机械配套情况和施工效果 。
In this paper, according to the project situation and general construction requirement of the adit of Wulong tunnel, considering the procedures and steps such as excavation, support, transportation, lining, ventilation, and so on, the equipped machinery and its working in tunneling is introduced. Its effectiveness is also discussed.
出处
《现代隧道技术》
EI
2003年第2期50-54,共5页
Modern Tunnelling Technology