摘要
结合江西省军民水库的除险加固设计 ,就病险土石坝除险加固设计的防洪标准确定、大坝基础资料分析和整理、除险加固方案选择以及大坝监测系统完善等问题进行探讨 。
Pointing at the design of stabilization for dangerous release of the earth-rockfill dam, the paper discusses some problems as the determination of flood control standard, the analysis of basic data of the dam, the alternative select of stabilization, and the completeness of monitoring system.
出处
《水利与建筑工程学报》
2003年第1期49-53,共5页
Journal of Water Resources and Architectural Engineering