摘要
文中就某工程溢洪道体型布置进行分析 ,对所存在的控制段进口流态欠佳及底流消力池设计欠合理等问题进行了试验研究 ,该泄洪建筑物的布置及泄洪消能中所存在的问题在此类工程中有一定的代表性和典型性 。
The defects of flow patterns at inlet in control reach and the design of underflow punge pool are tested and studied pointing at the pattern layout of the spillway in a certain project. These defects have representation in the same type of the projects.
出处
《水利与建筑工程学报》
2003年第1期22-25,共4页
Journal of Water Resources and Architectural Engineering
关键词
河岸式溢洪道
导流翼墙
联合消能
试验
chute spillway
diversion wing wall
joint dissipation of energy
experimental study