期刊文献+

我国第一座脉冲堆稳态运行试验 被引量:2

Operational Tests at Steady State in the First Pulsed Reactor of China
下载PDF
导出
摘要 本文简要地介绍了我国第一座脉冲堆稳态运行试验方法和设施,给出了冷态和热态以及不同功率下的临界棒位,并给出了反应性、中子通量、功率系数、平衡氙毒和碘坑的测量结果,提供了一批有价值的工程试验数据。本堆实现了1MW 稳态功率运行,进行了连续72小时满功率运行,对反应堆的控制、保护、测量仪器及各系统和设备进行了考验。试运行结果表明:本堆性能良好,各项指标均已达到了设计要求。 The paper briefly introduces the operational tests methodsand facilities at steady state of the first pulsed reactor of Chi-na.The critical positions of the control rods in cold and hot re-actor core and various power condition are given The reactivi-ty,neutron flux,power coefficient,equilibrium Xenon poisoningand Iodic pit are measured and the results are shown.A numberof valuable engineering test data are provided.The pulsed reactor has realized 1MW steady-state operation,it has gone a steady-state trail run at full power for 72 hours.Reactor control and protection systems,instrumentation,andvarious systems and equipments were tested.The reactor showsgood performances in compliance with the design specification.
出处 《核动力工程》 EI CAS CSCD 北大核心 1992年第5期37-43,共7页 Nuclear Power Engineering
关键词 脉冲堆 运行 中子通量 试验 Pulsed reactor Steady-state operation Reactivity Neutron flux Power test
  • 相关文献

同被引文献3

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部