摘要
对凌钢供热系统存在的问题进行了分析,提出了改进措施,介绍了焦化厂初冷器和热电厂汽轮机的余热利用情况。
Existing problems of heatsupply system are analysed, improving measures are put forward, and utilization of waste heat of gas primary coolers and steam turbines of cogereration power plant is introduced.
出处
《煤气与热力》
2003年第4期245-246,共2页
Gas & Heat