摘要
介绍了水丰水电站初期运行情况及出现的主要问题 ,电站经恢复改建后为中朝两国做出很大的贡献 ,不仅提供了动力和能源 。
This article mainly deals with the initial operation conditions and main problems appeared during that time in Shuifeng Hydroelectric Power Plant,which have made great contributions to both China and PDRK after being remodeled.It has not only provided power and energy but also avoided or reduced flood that may otherwise break out in the down stream.
出处
《东北电力技术》
2003年第4期5-9,共5页
Northeast Electric Power Technology