摘要
介绍了他达铁矿高平洗选厂由于矿石原矿性质变化,原工艺流程已不能满足生产要求,进行技改的措施、工艺设计。
In the Ore-dressing Plant of Tada Iron Mine,the existing technological flow-sheet can not meet the requirement of operation any longer due to the change of properites of raw ore.The measures for technical reform and the principle of technological are presented in this paper.
出处
《云南冶金》
2003年第2期30-32,共3页
Yunnan Metallurgy
关键词
铁矿
工艺流程
选矿
洗矿
改造
refractory ore
ore-dressing
technical reform flow-sheet