摘要
该文简要介绍了上海市污水治理二期工程中截流系统、过黄浦江倒虹管、污水输送总管、连接管、中途泵站、出口泵站的设计内容,着重介绍了设计中采用的新工艺、新技术、新材料和新设备。
This article briefly intoduced the design of the catchment system, inverted - siphon pipes across the river, main wastewater transportation pipes, connection pipes, midway pump stations and outlet pump station; emphasized the new techniques, materials and equipments adopted in Shanghai Sewerage Project II.
出处
《净水技术》
CAS
2003年第2期37-39,共3页
Water Purification Technology