摘要
介绍了深圳市罗芳污水处理厂二期工程的工艺概况和调试过程 ,以及氧化沟流场和溶解氧场测试结果。该工程各构筑物、设备皆能够正常运行 ,出水水质稳定并达到国家二级污水处理厂一级排放标准 ,其生物除磷效果达到国际先进水平 ,单位电耗在国内外污水处理厂中处于先进水平 ,调试结果证明该工程是成功的。
The process flow and the course of trail Fun of this new facility are presented,including the flow pattern and the DO distribution tests of the oxidation ditches.All the units are normal in operation,and the stable effluent quite enough to meet the requirements of class I in the national wastewater discharge standard has been obtained.The trailrun is successful with excellent biological P and N removals at advanced level as international and specific power con sumption good enough than that of WWTPs at home.
出处
《给水排水》
CSCD
北大核心
2003年第4期1-6,共6页
Water & Wastewater Engineering