摘要 针对顾北矿南一1#煤采区煤层回风巷复合顶板的地质条件,为了保证准备巷道在整个采区服务年限内支护安全,采用理论分析、相似模拟、数值模拟及现场监测等'四位一体'的研究手段确定顾北矿A组煤准备巷道合理锚杆支护参数,提出全长锚固预应力技术方案,开展了工业性试验,巷道顺利安全贯通,12个月的矿压观测表明,顶底板位移量最大值为140 mm,两帮位移量为80 mm,巷道变形较小。 In view of the geological conditions of the composite roof of the return air roadway in southen wing of Gubei Coal Mine,in order to ensure the support safety of the prepared roadway in the whole service life of the mining area,the rational bolt support parameters of the preparation roadway in group A coal of Gubei Coal Mine are determined by the'four-in-one'research means of theoretical analysis,analogy simulation,numerical simulation and on-site monitoring,and the technical scheme of full-length bolting and prestressing is proposed.Industrial tests have been carried out and the roadway has been running smoothly and safely.The 12-month observation of rock pressure shows that the maximum displacement of roof and floor is 140 mm,the displacement of both sides is 80 mm,and the deformation of roadway is small.
作者 邵德盛 查德求 赵磊 王威 王福海 陈康 王庆牛 SHAO Desheng;ZHA Deqiu;ZHAO Lei;WANG Wei;WANG Fuhai;CHEN Kang;WANG Qingniu(Anhui Province Coal Science Research Institute,Hefei230001,China;Gubei Coal Mine Huaizhe Coal&Power Co.,Ltd.,Huainan232150,China)
出处 《煤矿安全》 CAS 北大核心 2019年第9期84-87,91,共5页 Safety in Coal Mines
关键词 全长锚固 准备巷道 四位一体 联合支护 数值模拟 full-length anchorage preparation roadways quaternity combined support numerical modeling
  • 相关文献

参考文献18

二级参考文献132

共引文献119

同被引文献27

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部