期刊文献+

红庆河煤矿主立井提升系统创新设计与实践 被引量:7

Innovation Design of Extra Large Drilling in Hongqinghe Mine
下载PDF
导出
摘要 特大型煤矿主井提升系统工程设计配套技术成功应用于红庆河煤矿主井提升系统项目,且在5×6内装式塔式9000kW提升机、交-直-交变频控制系统、容量50t特大型箕斗、15. 18m/s的最快提升速度、高速稳罐技术、箕斗更换便捷技术、高承载力的井筒装备、大直径9. 5m井筒冻结井壁减薄理论等技术方面进行首创,完成红庆河煤矿主井提升能力1500万t/a巨大目标,成为煤矿建设史上的一次大的跨越,解决了约束特大型立井工程项目建设的核心难题,为提升技术进一步发展奠定坚实基础,为我国类似矿井的设计和建设积累了经验,对特大型煤矿井工开采提供了新思路。 Extra-large mine main shaft lifting system engineering design supporting technology has been successfully applied to the main shaft of Hongqinghe lifting system project,in which a lot of theory and technology are initiated,such as the 5×6 builttower 9000 k W hoist,AC-DC-AC frequency control system,50 t capacity extra-large skip,the maximum lifting speed of15.18 m/s,high-speed tank stabilizing technology,skip replacement technology,high capacity of wellbore equipment,9.5 m diameter borehole wall thinning theory,etc.The hoisting capacity of 15 Mt/a is achieved,the core constraints of large-scale vertical shaft project construction is solved.The project has laid a solid foundation for further technological development,accumulated experience in the design and construction of similar mines in China and provided new ideas for the mining of extralarge mines.
作者 仲松 ZHONG Song(China Coal Technology and Engineering Group Nanjing Design and Research Institute Co.,Ltd.,Nanjing 210031,China)
出处 《煤炭工程》 北大核心 2019年第6期39-42,共4页 Coal Engineering
关键词 特大型矿井 主井提升系统 50t箕斗 高速稳罐 井筒装备 extra-large mine main shaft hoist system 50t skip high-speed tank stabilizing shaft equipment
  • 相关文献

参考文献6

二级参考文献20

共引文献8

同被引文献67

引证文献7

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部