摘要 为了确保掘进巷道安全快速过陷落柱,提高巷道过陷落柱期间顶板稳定性,山西宏宇诚铸建设工程有限公司同盈项目部通过技术研究,对同盈矿2#层2102巷过陷落柱时采取施工锚索网及架设U29型钢棚联合支护工艺,并对施工过程中提出了若干项安全施工措施,实际应用效果表明,联合支护工艺及安全措施有效保证了巷道施工安全,加快了巷道过陷落柱掘进速度,取得了显著成效。 In order to ensure the safe and rapid passage of the drifting roadway through the collapse column and improve the stability of the roof during the passage of the collapse column, Shanxi Hongyucheng Casting Construction Engineering Co., Ltd. adopted the combined support technology of construction anchor cable net and U29 steel shed when passing through the collapse column in the 2# layer 2102 roadway of Tongying Coal Mine through technical research. The practical application results show that the combined support technology and safety measures effectively ensure the safety of roadway construction, speed up the roadway driving speed through the collapse column, and achieve remarkable results.
作者 马卫勇 MA Weiyong(Shanxi Hongyu Cheng Casting Construction Engineering Co. Ltd.. ,Shuozhou 038300 ,China)
出处 《煤矿现代化》 2019年第2期20-22,共3页 Coal Mine Modernization
关键词 掘进巷道 陷落柱 支护工艺 安全措施 Tunnelling Collapse column Support technology Safety measures
  • 相关文献

参考文献7

二级参考文献2

共引文献18

同被引文献26

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部