摘要
韦家沟煤矿目前已进入-320m深部开采水平,掘进工作面半煤巷施工过程中时遇瓦斯超限情况发生,特别是-320m水平北一采区南翼,半煤岩巷放炮瓦斯涌出量大,严重威胁矿井安全生产,经浅眼松动爆破技术及改变掏槽眼布置的应用,对减少瓦斯瞬间涌出量、控制瓦斯超限情况起到了很好的效果。
Weijiagou Coal Mine has entered the level of-320m deep mining at present. During the construction of semi-coal roadway in heading face, gas exceeding the limit often occurs. Especially in the south wing of North-first mining area at-320m level, gas emission from semi-coal and rock roadway is large, which seriously threatens the safety of mine production. Through shallow-hole loosening blasting technology and changing the cutting hole. The application of layout has played a very good role in reducing instantaneous gas emission and controlling gas exceeding the limit.
作者
张清
ZHANG Qing(Chongqing can invest in Chongqing New Energy Co., Ltd. Yung Wing management center, Rongchang, Chongqing 402465,China)
出处
《煤矿现代化》
2019年第2期81-82,85,共3页
Coal Mine Modernization