期刊文献+

低水头闸坝式枢纽工程泥沙问题研究 被引量:4

Study on Sediment at Gated Dam with Low Head
下载PDF
导出
摘要 低水头闸坝式枢纽工程在山区、平原中小河流上应用较多,由于有供水及引水发电的需要,需要解决首部枢纽的取水防沙、拦沙排沙及闸下游的消能防冲等泥沙问题。根据一些工程的模型试验成果,对这些问题进行总结,供设计和运行管理部门参考。 Hydropower project with low head and gated dam is usually located in small rivers in a mountainous area and plain . For water supply and power generation , sediment problems concerning water intake , sediment control , sediment trapping , sediment discharge at headwork and energy dissipation and anti-scour downstream must be solved . According to model test results of some projects , above mentioned problems are studied and the results are provided to designers and operators for reference .
作者 李远贤
出处 《四川水力发电》 2003年第2期55-57,68,共4页 Sichuan Hydropower
关键词 低水头闸坝式枢纽工程 拦沙排沙 消能防冲 泥沙 取水防沙 water intake and sediment control sand flushing helical flow start velocity
  • 相关文献

同被引文献24

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部