鄂尔多斯白家海子矿井冻结管沉管技术研究

Research on Sinking Technology of Frozing Pipe in Baijiahaizi Coal Mine of Erdos
下载PDF
导出
摘要 从钻孔轨迹、地质因素及水泥浆置换3个方面,结合施工过程中收集的具体资料,对内蒙古白家海子矿井中央进风井冻结管下放困难的问题进行了深入探讨。结果表明:定向拐点、钻孔方位角、地层产状和岩性以及水泥浆液对沉管困难均有影响,然而其主控影响机制为670~690 m层位的泥岩遇水膨胀致使钻孔缩径。 Has carried a deep discussion about which factors lead to the problem that the difficulty on sinking of the frozing pipe in Baijiahaizi coal mine of Inner Mongolia from the trajectory of borehole,the geological factors and the replacement of slurry. The result shows that the directional inflection point, the drilling azimuth, the attitude of stratum and properties of rock and cement grout all have an influence on sinking of frozing pipe of course, the main controling effect mechanism is that the mudstone of 670~690 meters react with water and lead to reduce the diameter of borehole.
出处 《煤炭技术》 CAS 北大核心 2015年第11期74-76,共3页 Coal Technology
关键词 冻结管 下沉困难 钻孔轨迹 地层产状 岩性 水泥浆置换 frozing pipe difficulty of sinking trajectory of borehole attitude of stratum properties of rock replacement of slurry
  • 相关文献

参考文献4

二级参考文献40

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部