期刊文献+

砂石管道井在矿井中的应用

Application of Sandstone Pipe Shaft in Mine
下载PDF
导出
摘要 为了缓减长平公司副斜井和副立井的下料压力,设计了在釜山工业园附近由地面向井下施工砂石管道井。同时,在地面安设装料装置,在井下安设卸料装置,形成以砂石管道井为主的一套独立下料系统。砂石管道井净直径准300 mm,地面由铲车配合带式输送机装料,井下由铲车配合胶轮车进行运料。砂石管道井系统投运后,解决了制约矿井下料的难题,特别是解决了喷浆和铺底材料的供应问题。 In order to reduce the batching pressure of the auxiliary inclined shaft and auxiliary vertical shaft of Changping company,it is designed to construct a sandstone pipe shaft from the ground to the mine near the Busan industrial park.Meanwhile,a loading device is installed on the ground,and a discharging device is installed in the mine to form an independent batching system with the sandstone pipe shaft as its main part.The net diameter of the sandstone pipe shaft isΨ300 mm,the materials are loaded by forklifts and belts on the ground,and transported by forklifts and rubber wheel vehicle in the mine.After the sandstone pipe shaft was put into operation,it solved the problem of batching in the mine,especially the problem of supplying grouting and paving materials.
作者 王晓东 WANG Xiao-dong(Changping Company,Jincheng Anthracite Mining Group,Jincheng 048400,China)
出处 《煤炭技术》 CAS 2019年第8期33-35,共3页 Coal Technology
关键词 砂石 管道井 矿井 应用 sandstone pipe shaft mine application
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部