期刊文献+

立井直接延深 被引量:1

Direct Shait Extension
下载PDF
导出
摘要 柳新煤矿设计能力30万吨/年,1978年投产,当年采煤13万吨,1983年达产,产煤32万吨。为了挖掘矿井潜力,扩大生产能力,进行矿井技术改造,使产量达到45万吨/年,进行延深工程。由-260水平延深到-430水平。经过多种矿井延深方案的比较,利用主井一水平上箕斗的有利条件,决定采用直接延深法,可缩短施工准备时间,加快延深施工速度,节约投资。立井延深是1983年10月动工的。 Direct shaft extension is that extension starts directly from production level without interfering with normaly hoisting.Hydraulic screw tension device is used instead of original plumb tension device of steel rope guides in Liuxin coal mine;there is a 18.3m of shaft section,starting from base guidebeam downward to the production level,which is used to install protection disk and to proceed with hoisting work of the shaft extension.Comparing with auxiliary level extention method the DSE saves a lot of temporary engineering works.The shaft is extended from -260m to -430m with 5m clearance diameter.Construction of main shaft extension including skip loading pocket began in Oct.1983 and finished in Aug.1984.
作者 赵振宇
出处 《煤炭科学技术》 CAS 1985年第2期7-10,63,共5页 Coal Science and Technology
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部